search
  • Home
  • About
    • About the Journal
    • Submissions
    • Editorial Team
    • Author fee(s)
  • Current
  • Archives
  • Editorial Team
  • Contact
  • Register
  • Login
  • Search
logo
  • Register
  • Login
Skip to main content Skip to main navigation menu Skip to site footer
logo
  • Home
  • About
    • About the Journal
    • Submissions
    • Editorial Team
    • Author fee(s)
  • Current
  • Archives
  • Editorial Team
  • Contact
Online ISSN : 2476-3055
Print ISSN : 2676-6957
  1. Home /
  2. Search

Search

Advanced filters
1 - 25 of 48 items 1 2 > >> 

A Framework to Predict Time and Cost Risks based on Project Factors

DOI : 10.28991/cej-03091195
Mohamad Hadi Jalili , Martin Skitmore
2738-2755
Abstract : 1756
PDF : 885
DOI : 10.28991/cej-03091195

The Effectiveness of the Procurement at the Construction Services Selection Implementation Center

DOI : 10.28991/CEJ-2024-010-03-013
. Sofian , H. Parung , S. Burhanuddin , R. Arifuddin
847-858
Abstract : 1428
PDF : 732
DOI : 10.28991/CEJ-2024-010-03-013

Effect of Construction Manager's Political Skills on Relationship between Quality Management Practices and Inter-Organizational Project Success

DOI : 10.28991/CEJ-2024-010-01-019
Ahsan Hussain Khan , Sepanta Naimi
299-316
Abstract : 1130
PDF : 703
DOI : 10.28991/CEJ-2024-010-01-019

A Case Study of S-Curve Analysis: Causes, Effects, Tracing and Monitoring Project Extension of Time

DOI : 10.28991/cej-2021-03091679
Habib Musa Mohamad , Mohamad Ibrahim Mohamad , Ismail Saad , Nurmin Bolong , J. Mustazama , Siti Nooraiin Mohd Razali
649-661
Abstract : 2953
PDF : 1323
DOI : 10.28991/cej-2021-03091679

Building Information Modeling Strategy in Mitigating Variation Orders in Roads Projects

DOI : 10.28991/cej-2020-03091596
Musab Abuaddous , Ja'far A. Aldiabat Al-Btoosh , Mohammed A. KA. Al-Btoush , Abdulrazzaq Jawish Alkherret
1974-1982
Abstract : 1727
PDF : 965
DOI : 10.28991/cej-2020-03091596

Integration of Blockchain-Enabled Smart Contracts in Construction: SWOT Framework and Social Network Analysis

DOI : 10.28991/CEJ-2024-010-05-020
Monica Ghaly , Emad Elbeltagi , Adel Elsmadony , Mohamed A. Tantawy
1662-1697
Abstract : 2675
PDF : 1209
DOI : 10.28991/CEJ-2024-010-05-020

Construction Project Delay Risk Assessment Based on 4M1E Framework and Afghanistan Situation

DOI : 10.28991/CEJ-2024-010-01-06
Hijratullah Sharifzada , Yu Deming
100-116
Abstract : 1472
PDF : 850
DOI : 10.28991/CEJ-2024-010-01-06

The Analysis of the Factors Which Affect the Building Costs in Indonesia

DOI : 10.28991/cej-2017-00000072
Taufik Dwi Laksono
57-62
Abstract : 2199
PDF : 832
DOI : 10.28991/cej-2017-00000072

The Necessity of Management Team Formation and Its Effect on Civil Engineering Projects Success

DOI : 10.28991/cej-2016-00000033
Mehdi Bahadori Kosanji Zare , Alireza Mirjalili , Mohammad Mirabi
286-294
Abstract : 1444
PDF : 851
DOI : 10.28991/cej-2016-00000033

Lean Construction Practice on Toll Road Project Improvement: A Case Study in Developing Country

DOI : 10.28991/CEJ-2023-09-12-016
Mohammed Ali Berawi , Mustika Sari , Perdana Miraj , . Mardiansyah , Gunawan Saroji , Bambang Susantono
3186-3201
Abstract : 1876
PDF : 1036
DOI : 10.28991/CEJ-2023-09-12-016

A Proposal Model for Estimation of Project Success in Terms of Radial Based Neural Networks: A Case Study in Iran

DOI : 10.28991/cej-030924
Mahdi Asgari , Ali Kheyroddin , Hosein Naderpour
904-919
Abstract : 1871
PDF : 706
DOI : 10.28991/cej-030924

Labor Productivity Study in Construction Projects Viewed from Influence Factors

DOI : 10.28991/CEJ-2023-09-03-07
Rusdi U. Latief , N. M. Anditiaman , I. R. Rahim , R. Arifuddin , M. Tumpu
583-595
Abstract : 1847
PDF : 1204
DOI : 10.28991/CEJ-2023-09-03-07

Analysis of the Schedule Risk of Prefabricated Buildings Based on ISM and Research of Transfer Path

DOI : 10.28991/CEJ-2022-08-01-010
Xiaobo Shi , Chenchen Liu , Wanying Liu , Fang Shen , Jiayan Chen , Kunkun Ma
134-144
Abstract : 1407
PDF : 844
DOI : 10.28991/CEJ-2022-08-01-010

New Rethinking on Managers' Competency Criteria and Success Factors in Airport Construction Projects

DOI : 10.28991/cej-03091192
Alireza Roshani , Mohsen Gerami , Omid Rezaeifar
2692-2701
Abstract : 1464
PDF : 765
DOI : 10.28991/cej-03091192

Design Changes in Construction Projects – Causes and Impact on the Cost

DOI : 10.28991/cej-2019-03091360
Mughees Aslam , Edmund Baffoe-Twum , Farhan Saleem
1647-1655
Abstract : 7671
PDF : 2085
DOI : 10.28991/cej-2019-03091360

Analysis of the Benefits of Implementation of IPD for Construction Project Stakeholders

DOI : 10.28991/cej-2020-03091570
Mahdi Alinezhad , Ehsan Saghatforoush , Zahra Kahvandi , Christopher Preece
1609-1621
Abstract : 2329
PDF : 1149
DOI : 10.28991/cej-2020-03091570

Designing Human Health Risk Management Model for Dam Construction Projects

DOI : 10.28991/cej-03091148
R. Ghorbanalipour , AM. Ahmadvand , M. Ahmadvand , H. Eghbali
2173-2185
Abstract : 1437
PDF : 831
DOI : 10.28991/cej-03091148

Critical Construction Readiness Factors for Bridge Projects

DOI : 10.28991/CEJ-SP2024-010-015
Hany Abd Elshakour Mohamed , Anas G. Hasaballah , Adel M. El-Kelesh
291-318
Abstract : 654
PDF : 274
DOI : 10.28991/CEJ-SP2024-010-015

Contributing Cost Variation Factors in Highway Projects

DOI : 10.28991/cej-03091115
Samiullah Sohu , Abd Halid Abdullah , Sasitharan Nagapan , Ashfaque Ahmed Jhatial , Muhammed Tahir
1793-1798
Abstract : 1613
PDF : 818
DOI : 10.28991/cej-03091115

A Hybrid Fuzzy TOPSIS – Best Worst Method for Risk Prioritization in Megaprojects

DOI : 10.28991/cej-2019-03091330
Ashraf Norouzi , Hamid Ghayur Namin
1257-1272
Abstract : 2830
PDF : 1298
DOI : 10.28991/cej-2019-03091330

Fundamental Challenges and Management Opportunities in Post Disaster Reconstruction Project

DOI : 10.28991/CEJ-2023-09-09-05
Meervat R. Altaie , Marwa Makki Dishar , Ibrahim F. Muhsin
2161-2174
Abstract : 1116
PDF : 696
DOI : 10.28991/CEJ-2023-09-09-05

Development of a Prediction System for Design Defects of Buildings

DOI : 10.28991/CEJ-SP2023-09-017
Ahmed Nouh , El-Sayed El-Kasaby , Khaled Aboulata
217-235
Abstract : 559
PDF : 368
DOI : 10.28991/CEJ-SP2023-09-017

Evaluating the Success of Project Management Information Systems' Comprehensive Planning in Industrialized Building Systems

DOI : 10.28991/cej-03091103
Roohollah Taherkhani
1667-1677
Abstract : 1800
PDF : 823
DOI : 10.28991/cej-03091103

The Risk Assessment of Dam Construction Projects Using Fuzzy TOPSIS (Case Study: Alavian Earth Dam)

DOI : 10.28991/cej-2016-00000022
Sina Shaffiee Haghshenas , Mir Ahmad Lashteh Neshaei , Pouyan Pourkazem , Sami Shaffiee Haghshenas
158-167
Abstract : 4767
PDF : 1713
DOI : 10.28991/cej-2016-00000022

Behavioral Differences Towards Internal and External Factors in Making the Bid/No Bid Decision

DOI : 10.28991/cej-2019-03091323
Abdulrahman Bageis , Ibrahim I. Falqi , Abdullah Alshehri , Saleh Alsulamy , Tariq A. Alsahli
1189-1196
Abstract : 2099
PDF : 903
DOI : 10.28991/cej-2019-03091323
1 - 25 of 48 items 1 2 > >> 

Login

Register

Publisher and Affiliated Societies

Publisher

Salehan Institute of Higher Education

 

Society Collaborations

Ital Publication (EUHERA)

 

Indexing & Abstracting

Impact Factor Master Journal List

Scopus

 

SCImago Journal & Country Rank

 

SidebarMenu

  Focus and Scope   Editorial Team   Author Guidelines   Journal Policies   Publication Ethics   Abstracting & Indexing   Open Access Policy   Author(s) Fee

Journal Imprint

Journal Imprint

 

Journal Metrics

Publication Start Year:

2015

JCR 2024 Impact Factor (IF):

4.9

JIF QUARTILE:

Q1

SJR 2024 Quartile:

Q1

Acceptance Rate:

27%

Review Speed (Average):

81 days

Issue Per Year:

12

Number of Volumes:

11

Number of Issues:

119

Number of Articles:

1816

Number of Reviewers:

3624

Number of Contributors:

6178

Contributing Countries:

91

No. of WoS Citations:

7986

Scopus CiteScore:

6.5

No. of Google Citations:

24065

Google h-index:

56

Google i10-index:

804

Abstract Views:

11,481,612

PDF Download:

5,908,793

Last updated: July 02, 2025

Follow us

Follow Us

Most Cited Articles

Heavy Metal Removal Investigation in Conventional Activated Sludge Systems

March 1, 2020
Magdi Buaisha et al.
Vol. 6 No. 3 (2020): March

Modeling of the Solar Thermal Energy Use in Urban Areas

July 1, 2020
Drita Qerimi et al.
Vol. 6 No. 7 (2020): July

Adsorption Behavior of Heavy Metal Ions by Hybrid Inulin-TEOS for Water Treatment

September 1, 2022
Wan Norfazilah Wan Ismail et al.
Vol. 8 No. 9 (2022): September

Application of Tuned Mass Dampers for Structural Vibration Control: A State-of-the-art Review

August 1, 2020
Fatemeh Rahimi et al.
Vol. 6 No. 8 (2020): August

visitors

Analytics

Flag Counter

Web Analytics
View My Stats

Information

  • For Readers
  • For Authors
  • For Librarians

Address

  • Publisher Address: Talar bridge, Babol Road, Ghaemshahr, Mazandaran, Iran.
  • Office Address: Civil Engineering Faculty, K.N.Toosi University of Technology, No. 1346, Vali Asr Street, Tehran, Iran.

Contact Info:

  • Prof. M. R. Kavianpour
  • Principal Contact
  • kavianpour@civilejournal.org
  • Help Desk
  • office@civilejournal.org
CEJ
Copyright © Civil Engineering Journal , All rights reserved. This is an open-access article distributed under the terms of the Creative Commons Attribution-NonCommercial-ShareAlike 4.0 International License. Licensed under Creative Commons License a Creative Commons Attribution 4.0 International License. Site using Noble OJS 3 Theme
Themes by Openjournaltheme.com Themes by Openjournaltheme.com