Development of a Prediction System for Design Defects of Buildings
Downloads
Doi: 10.28991/CEJ-SP2023-09-017
Full Text: PDF
Downloads
[2] Andi, & Minato, T. (2003). Design documents quality in the Japanese construction industry: Factors influencing and impacts on construction process. International Journal of Project Management, 21(7), 537–546. doi:10.1016/S0263-7863(02)00083-2.
[3] American Society of Civil Engineers (ASCE). (2012). Quality in the Constructed Project. American Society of Civil Engineers (ASCE), Reston, United States. doi:10.1061/9780784411896.
[4] Bubshait, A. A., & Al-Abdulrazzak, A. (1996). Design quality management activities. Journal of Professional Issues in Engineering Education and Practice, 122(3), 104–106. doi:10.1061/(ASCE)1052-3928(1996)122:3(104).
[5] Darwish, M. I. (2005). Factors affecting design and documentation quality in construction industry. Master Thesis, King Fahd University of Petroleum and Minerals, Dhahran, Kingdom of Saudi Arabia.
[6] Lam, P. T. I., Wong, F. W. H., & Chan, A. P. C. (2006). Contributions of designers to improving buildability and constructability. Design Studies, 27(4), 457–479. doi:10.1016/j.destud.2005.10.003.
[7] Tilley, P. A., & Barton, R. (1997). Design and documentation deficiency-causes and effects. Proceedings of the First International Conference of Construction Process Reengineering, 14-15 July, 1997, Gold Coast, Australia.
[8] Lu, Y., Sood, T., Chang, R., & Liao, L. (2020). Factors impacting integrated design process of net zero energy buildings: an integrated framework. International Journal of Construction Management, 22(9), 1700–1712. doi:10.1080/15623599.2020.1742625.
[9] Kamal, A., Abas, M., Khan, D., & Azfar, R. W. (2022). Risk factors influencing the building projects in Pakistan: from perspective of contractors, clients and consultants. International Journal of Construction Management, 22(6), 1141–1157. doi:10.1080/15623599.2019.1683693.
[10] Gashaw, T., & Jilcha, K. (2023). Design risk modeling and analysis for railway construction projects. International Journal of Construction Management, 23(14), 2488–2498. doi:10.1080/15623599.2022.2070344.
[11] Hamzah, N., Ramly, A., Salleh, H., Tawil, N. M., Khoiry, M. A., & Che Ani, A. I. (2011). The importance of design process in housing quality. Procedia Engineering, 20, 483–489. doi:10.1016/j.proeng.2011.11.191.
[12] Chong, W.-K., & Low, S.-P. (2006). Latent Building Defects: Causes and Design Strategies to Prevent Them. Journal of Performance of Constructed Facilities, 20(3), 213–221. doi:10.1061/(asce)0887-3828(2006)20:3(213).
[13] Koo, H. J., & O'Connor, J. T. (2022). Building information modeling as a tool for prevention of design defects. Construction Innovation, 22(4), 870–890. doi:10.1108/CI-02-2021-0033.
[14] Marzouk, M., ElSharkawy, M., & Mahmoud, A. (2022). Analysing user daylight preferences in heritage buildings using virtual reality. Building Simulation, 15(9), 1561–1576. doi:10.1007/s12273-021-0873-9.
[15] Chen, G., Chen, J., Yuan, J., Tang, Y., Xiahou, X., & Li, Q. (2022). Exploring the Impact of Collaboration on BIM Use Effectiveness: A Perspective through Multiple Collaborative Behaviors. Journal of Management in Engineering, 38(6). doi:10.1061/(asce)me.1943-5479.0001098.
[16] Ali, A. S., Keong, K. C., Zakaria, N., Zolkafli, U., & Akashah, F. (2013). The effect of design on maintenance for school buildings in Penang, Malaysia. Structural Survey, 31(3), 194–201. doi:10.1108/SS-10-2012-0030.
[17] Zheng, H., Liu, W., & Xiao, C. (2018). Structural relationship model for design defect and influencing factors in the concurrent design process. International Journal of Production Research, 56(14), 4897–4924. doi:10.1080/00207543.2018.1447704.
[18] Waziri, B. S. (2016). Design and construction defects influencing residential building maintenance in Nigeria. Jordan Journal of Civil Engineering, 10(3), 313–323. doi:10.14525/JJCE.10.3.3605.
[19] Minato, T. (2003). Representing causal mechanism of defective designs: a system approach considering human errors. Construction Management and Economics, 21(3), 297–305. doi:10.1080/0144619032000056135.
[20] Tayeh, B. A., Hamad, R. J. A., Alaloul, W. S., & Almanassra, M. (2019). Factors Affecting Defects Occurrence in Structural Design Stage of Residential Buildings in Gaza Strip. The Open Civil Engineering Journal, 13(1), 129–139. doi:10.2174/1874149501913010129.
[21] Gransberg, D. D., & Molenaar, K. (2004). Analysis of Owner's Design and Construction Quality Management Approaches in Design/Build Projects. Journal of Management in Engineering, 20(4), 162–169. doi:10.1061/(asce)0742-597x(2004)20:4(162).
[22] Wu, H., Zhong, B., Li, H., Guo, J., & Wang, Y. (2021). On-Site Construction Quality Inspection Using Blockchain and Smart Contracts. Journal of Management in Engineering, 37(6), 04021065. doi:10.1061/(asce)me.1943-5479.0000967.
[23] Josephson, P. E. (1998). Defects and defect costs in construction. Working Paper, Department of Management of
Construction and Facilities, Chalmers University of Technology, Gothenburg, Sweden.
[24] O'Connor, J. T., & Koo, H. J. (2021). Proactive Design Quality Assessment Tool for Building Projects. Journal of Construction Engineering and Management, 147(2), 04020174. doi:10.1061/(asce)co.1943-7862.0001980.
[25] Lee, J.-S. (2018). Value Engineering for Defect Prevention on Building Façade. Journal of Construction Engineering and Management, 144(8), 04018069. doi:10.1061/(asce)co.1943-7862.0001500.
[26] Jiang, Q., Qiang, M., & Lin, C. (2022). Collaborative Evaluation Method of Multiple Team Membership: Case Study of Engineering Design Company. Journal of Management in Engineering, 38(6), 05022014. doi:10.1061/(asce)me.1943-5479.0001096.
[27] Faqih, F., & Zayed, T. (2021). Defect-based building condition assessment. Building and Environment, 191, 107575. doi:10.1016/j.buildenv.2020.107575.
[28] Lupășteanu, V., Lupășteanu, R., & Chingălată, C. (2022). Condition assessment of buildings in Romania: A proposed method and case study. Journal of Building Engineering, 47. doi:10.1016/j.jobe.2021.103814.
[29] Gabaldón, L. B. F. (2017). Rehabilitation and lessons learned from the collapse of Viaduct 1 located on the Caracas-La-Guaira Highway in Venezuela. Structural Engineering International: Journal of the International Association for Bridge and Structural Engineering (IABSE), 27(3), 380–387. doi:10.2749/101686617X14881937385007.
[30] Madaj, A., & Siekierski, W. (2017). Determination of defect factors for a road bridge made of prestressed concrete. Structural Engineering International: Journal of the International Association for Bridge and Structural Engineering (IABSE), 27(3), 388–393. doi:10.2749/101686617X14881932436735.
[31] Abu-Reishah, L., & Hiyassat, M. A. (2023). The severity of design-construction interface risks in Jordanian construction industry. International Journal of Construction Management, 23(9), 1540–1548. doi:10.1080/15623599.2021.1983930.
[32] Xu, X., & Zou, P. X. (2020). Analysis of factors and their hierarchical relationships influencing building energy performance using interpretive structural modelling (ISM) approach. Journal of Cleaner Production, 272, 122650. doi:10.1016/j.jclepro.2020.122650.
[33] Hassanain, M. A., Al-Hammad, A. M., & Fatayer, F. (2014). Assessment of architectural defects attributed to lack of maintenance feedback to the design team. Architectural Science Review, 57(2), 132–138. doi:10.1080/00038628.2013.783459.
[34] Cruz, P. J. S., Topczewski, L., Fernandes, F. M., Trela, C., & Lourenço, P. B. (2010). Application of radar techniques to the verification of design plans and the detection of defects in concrete bridges. Structure and Infrastructure Engineering, 6(4), 395–407. doi:10.1080/15732470701778506.
[35] Vafeas, M., & Hilton, T. (2002). Client Defection in the Design Industry: A Study of the Causes, Process and Context of Switching Agencies. The Design Journal, 5(1), 14–25. doi:10.2752/146069202789378431.
[36] Qureshi, A. R. (1987). Designer's Responsibility. Safety and Reliability, 7(2), 28–29. doi:10.1080/09617353.1987.11691147.
[37] Beade-Pereda, H. (2017). The Responsibility of the Bridge Designer. Structural Engineering International, 27(3), 337–337. doi:10.1080/10168664.2017.11985640.
[38] Reich, T. (1959). Responsibility of the designer to-day. Journal of the Textile Institute Proceedings, 50(7), P330–P336. doi:10.1080/19447015908664268.
[39] Eekels, J. (1994). The Engineer as Designer and as a Morally Responsible Individual. Journal of Engineering Design, 5(1), 7–23. doi:10.1080/09544829408907868.
[40] Davey, C. L., McDonald, J., Lowe, D., Duff, R., Powell, J. A., & Powell, J. E. (2006). Defects liability management by design. Building Research and Information, 34(2), 145–153. doi:10.1080/09613210500492991.
[41] Egyptian Civil Code (1952). The Egyptian civil code, promulgated by Law No. 131 of 1948 in force since 15 October 1949. Cairo, Egypt.
[42] Al-Sanhouri, A.A. (1998). Al-Waseet in Explanation of the New Civil Code. Part 1, Volume 2, Al-Halabi Legal Publications, Beirut, Lebanon.
[43] Qatar Civil Code (2004). Qatar Civil Code Act No. 22/2004. Qatari Legal Portal (Al-Meezan), Doha, Qatar.
[44] Kuwait Civil Code (1980). Kuwait Civil Code Act No. 67/1980. Kuwait Govermnet, Kuwait City, Kuwait.
[45] FIDIC. (1987). FIDIC Red Book (4th Ed.), Geneva, Switzerland. Available online: https://fidic.org/books/red-book-1987-red-book-guide-1st-ed-1989 (accessed on June 2023).
[46] FIDIC. (1999). FIDIC Red Book. Geneva, Switzerland. Available online: https://fidic.org/books/construction-contract-1st-ed-1999-red-book (accessed on June 2023).
[47] Eggleston, B. (2008). The ICE Conditions of Contract. Wiley, Blackwell Publishing, New Jersey, United States.
[48] Hawker, G. (1999). ICE Conditions of Contract. Thomas Telford Ltd, London, England.
[49] Egyptian Government (1988). Egyptian Administrative Law No. 89 Issued in 1998. Cairo, Egypt.
[50] Egyptian Government (2018). Egyptian Administrative Law No. 182 Issued in 2018. Cairo, Egypt.
[51] Ingle, P. V., Mahesh, G., & M.D, D. (2021). Identifying the performance areas affecting the project performance for Indian construction projects. Journal of Engineering, Design and Technology, 19(1), 1–20. doi:10.1108/JEDT-01-2020-0027.
[52] Najjar, M. K., Figueiredo, K., Evangelista, A. C. J., Hammad, A. W. A., Tam, V. W. Y., & Haddad, A. (2022). Life cycle assessment methodology integrated with BIM as a decision-making tool at early-stages of building design. International Journal of Construction Management, 22(4), 541–555. doi:10.1080/15623599.2019.1637098.
[53] Khalef, R., & El-adaway, I. H. (2021). Automated Identification of Substantial Changes in Construction Projects of Airport Improvement Program: Machine Learning and Natural Language Processing Comparative Analysis. Journal of Management in Engineering, 37(6). doi:10.1061/(asce)me.1943-5479.0000959.
[54] Ahmed, M. E. K., & Girgs, I. R. N. (2023). A comparative study on achieving universally designed schools. Two case studies at Aswan city, Egypt. International Journal of Construction Management, 23(12), 2102–2115. doi:10.1080/15623599.2022.2042645.
[55] Othman, A. A. E., & Khalil, M. H. M. (2020). A lean talent management framework for maximizing creativity in architectural design firms. International Journal of Construction Management, 20(5), 520–533. doi:10.1080/15623599.2018.1490865.
[56] Barlow, R. P. G., Fisher, G. N., & Bowman, N. I. (2001). Reducing the Adversarial Nature of Consultation with Stakeholders: A Methodology to Help in the Design and Construction Stages of Construction Projects. International Journal of Construction Management, 1(1), 77–81. doi:10.1080/15623599.2001.10773025.
[57] Wong, P. S. P., Holdsworth, S., Crameri, L., & Lindsay, A. (2019). Does carbon accounting have an impact on decision-making in building design? International Journal of Construction Management, 19(2), 149–161. doi:10.1080/15623599.2017.1401290.
[58] Sha'ar, K. Z., Assaf, S. A., Bambang, T., Babsail, M., & Fattah, A. M. A. El. (2017). Design–construction interface problems in large building construction projects. International Journal of Construction Management, 17(3), 238–250. doi:10.1080/15623599.2016.1187248.
[59] Li, Y., & Ji, W. (2021). Robustness of Stakeholder Response Networks for Infrastructure System Protection. Journal of Management in Engineering, 37(6), 04021063. doi:10.1061/(asce)me.1943-5479.0000960.
[60] Beardmore, D. C., & Molenaar, K. R. (2023). Roadway design and construction in infrastructure limited contexts: a risk breakdown structure. International Journal of Construction Management, 23(10), 1675–1683. doi:10.1080/15623599.2021.1999768.
[61] Saghatforoush, E., Hosseini Nourzad, S. H., Zareravasan, A., & Jadidoleslami, S. (2023). Enablers for BIM application in architectural design: a robust exploratory factor analysis approach. International Journal of Construction Management, 23(9), 1549–1559. doi:10.1080/15623599.2021.1985775.
[62] Forghani, R., Sher, W., & Kanjanabootra, S. (2023). Critical technical design principles for maximizing the reuse of building components. International Journal of Construction Management, 23(7), 1187–1195. doi:10.1080/15623599.2021.1959126.
[63] Manoj, G., & Shivaji, C. Y. (2010). Design interface management of airport projects. International Journal of Construction Management, 10(3), 29–44. doi:10.1080/15623599.2010.10773148.
[64] Mitropoulos, P., & Tajima, V. (2022). Constructability opportunities in the engineering design of marine pier structures: a case study. International Journal of Construction Management, 22(3), 366–378. doi:10.1080/15623599.2019.1624677.
[65] García de Soto, D. B., Streule, T., Klippel, M., Bartlomé, O., & Adey, B. T. (2020). Improving the planning and design phases of construction projects by using a Case-Based Digital Building System. International Journal of Construction Management, 20(8), 900–911. doi:10.1080/15623599.2018.1502929.
[66] Xia, B., Chan, A. P. C., & Skitmore, M. (2012). A classification framework for design-build variants from an operational perspective. International Journal of Construction Management, 12(3), 85–99. doi:10.1080/15623599.2012.10773196.
[67] Taher, A. H., & Elbeltagi, E. E. (2023). Integrating building information modeling with value engineering to facilitate the selection of building design alternatives considering sustainability. International Journal of Construction Management, 23(11), 1886–1901. doi:10.1080/15623599.2021.2021465.
[68] Zhang, N., Wang, J., Al-Hussein, M., & Yin, X. (2023). BIM-based automated design of drainage systems for panelized residential buildings. International Journal of Construction Management, 23(15), 2683–2698. doi:10.1080/15623599.2022.2085853.
[69] Paik, S. mok, Leviakangas, P., & Choi, J. (2022). Making most of BIM in design: analysis of the importance of design coordination. International Journal of Construction Management, 22(12), 2225–2233. doi:10.1080/15623599.2020.1774837.
[70] Manu, P., Poghosyan, A., Agyei, G., Mahamadu, A. M., & Dziekonski, K. (2021). Design for safety in construction in sub-Saharan Africa: a study of architects in Ghana. International Journal of Construction Management, 21(4), 382–394. doi:10.1080/15623599.2018.1541704.
[71] Rohman, M. A., & Wiguna, I. P. A. (2021). Evaluation of road design performance in delivering community project social benefits in Indonesian PPP. International Journal of Construction Management, 21(11), 1130–1142. doi:10.1080/15623599.2019.1603095.
[72] Ramani, P. V., & Lingan, L. K. (2022). Developing a lean model to reduce the design process cost of gas insulated switchgear foundation using value stream mapping–a case study. International Journal of Construction Management, 22(4), 669–677. doi:10.1080/15623599.2019.1644756.
[73] Singh Rajput, T., & Thomas, A. (2023). Optimizing passive design strategies for energy efficient buildings using hybrid artificial neural network (ANN) and multi-objective evolutionary algorithm through a case study approach. International Journal of Construction Management, 23(13), 2320–2332. doi:10.1080/15623599.2022.2056409.
[74] Lam, E. W. M., Chan, A. P. C., & Chan, D. W. M. (2007). An Empirical Study on the Problems of Running Design and Build Projects in Construction. International Journal of Construction Management, 7(1), 1–15. doi:10.1080/15623599.2007.10773091.
[75] Shrestha, P. P., & Mani, N. (2014). Impact of Design Cost on Project Performance of Design-Bid-Build Road Projects. Journal of Management in Engineering, 30(3). doi:10.1061/(asce)me.1943-5479.0000220.
[76] Wasim, M., Vaz Serra, P., & Ngo, T. D. (2022). Design for manufacturing and assembly for sustainable, quick and cost-effective prefabricated construction–a review. International Journal of Construction Management, 22(15), 3014–3022. doi:10.1080/15623599.2020.1837720.
[77] Zhikun, D., Fungfai, N. G., & Jiayuan, W. (2010). Personal construct based factors affecting willingness to share knowledge between architects in a project design team. International Journal of Construction Management, 10(3), 1–11. doi:10.1080/15623599.2010.10773146.
[78] Yuce, B., Mastrocinque, E., Packianather, M. S., Pham, D., Lambiase, A., & Fruggiero, F. (2014). Neural network design and feature selection using principal component analysis and Taguchi method for identifying wood veneer defects. Production and Manufacturing Research, 2(1), 291–308. doi:10.1080/21693277.2014.892442.
[79] Kritikos, M., Concepción Maure, L., Leyva Céspedes, A. A., Delgado Sobrino, D. R., & HruŠ¡eckí½, R. (2019). A Random Factorial Design of Experiments Study on the Influence of Key Factors and Their Interactions on the Measurement Uncertainty: A Case Study Using the ZEISS CenterMax. Applied Sciences, 10(1), 37. doi:10.3390/app10010037.
[80] Kiritani, M. (1999). Design of experiments on production and reaction of point defects. Radiation Effects and Defects in Solids, 148(1), 233–267. doi:10.1080/10420159908229096.
[81] Gade, A. N., Jensen, R. L., Larsen, T. S., Nissen, S. B., & Andresen, I. (2021). Value-based decision making in the pre-design stage of sustainable building renovation projects–exploring two methods for weighting criteria. International Journal of Construction Management, 21(6), 648–663. doi:10.1080/15623599.2019.1578913.
[82] Lewis, C. D. (1982). Industrial and business forecasting methods: A practical guide to exponential smoothing and curve fitting. Butterworth Scientific, Teddington, United Kingdom.
- Authors retain all copyrights. It is noticeable that authors will not be forced to sign any copyright transfer agreements.
- This work (including HTML and PDF Files) is licensed under a Creative Commons Attribution 4.0 International License.