Analysis of Launcher’s Productivity in Erection Girder Using Time Motion Study Method

Danang Hadiyatmoko, Jati Utomo Dwi Hatmoko, M. Agung Wibowo

Abstract


Erection girder is one of the determinants of the success of bridge and road work, so in its implementation, it is of concern to many parties. Apart from lifting work that uses heavy equipment with a large capacity, it is also due to the high risk of erection work. Since using heavy equipment as a tool for the erection girder, then closely related to productivity and work time. Many factors affect the productivity of heavy equipment, and one of them is time, so a well and measurable work plan is needed. This study aims to provide solutions to problems regarding the productivity of the erection girder launcher method with a time motion study analysis for each work cycle. Time Motion Study is calculated using collected data from time and productivity records. The analysis model has been carried out with the amount of data of 58 erection girder cycles with the specification of Girder Profile I with 16 meters, 30 meters, 40 meters, and 60 meters in length. The modeling results are in the form of productivity nomograms and optimal productivity of the erection girder launcher method. The optimal productivity of a 16-meter girder is 0.901 girder/hour, 30 meters girder is 0.692 girder/hour, a 40 meters girder is 0.443 girder/hour, and 60 meters girder is 0.340 girder/hour. In this study, there are some renewals from other studies. From this study, it might be known about factors that affect the productivity of erection girders, such as the distance of the girder’s stockyard, the girder’s length, and erection time.

 

Doi: 10.28991/CEJ-2023-09-08-06

Full Text: PDF


Keywords


Erection; Productivity; Time-Motion Study.

References


Hasdian, E., Maulana, M. A., Fertilia, N. C., & Lutfiansyah, Y. (2022). Analysis Comparissons of Ereciton Girder Implementations Methods Using Laucher Gantry and Crawler Crane Based on Cost and Time. ADRI International Journal of Sciences, Engineering and Technology, 6(2), 78–88. doi:10.29138/ijset.v6i2.48.

Prakash, C., Rao, B. P., Shetty, D. V., & Vaibhava, S. (2020). Application of time and motion study to increase the productivity and efficiency. Journal of Physics: Conference Series, 1706(1), 12126. doi:10.1088/1742-6596/1706/1/012126.

Widiantoro, V., Ichsan, M., & Saputra, P. D. (2021). Measurement Analysis of Box Girder Production Cycle Times in Indonesia Infrastructure Projects. Advances in Engineering Research. doi:10.2991/aer.k.210810.002.

Awad, T., Guardiola, J., & Fraíz, D. (2021). Sustainable construction: Improving productivity through lean construction. Sustainability (Switzerland), 13(24), 13877. doi:10.3390/su132413877.

Chauhan, K. A., & Shah, R. A. (2019). Application of Time and Motion for Performance Enhancement of Building Construction Industry. International Journal of Innovative Technology and Exploring Engineering, 8(9S), 980–984. doi:10.35940/ijitee.i1158.0789s19.

Vinod Kumar Reddy, G., & Shyam Chambrelin, K. (2021). Application of Time and Motion study for Brickwork activity in Residential building. IOP Conference Series: Materials Science and Engineering, 1197, 012038. doi:10.1088/1757-899x/1197/1/012038.

Petroutsatou, K., & Kantilierakis, D. (2023). Productivity Analysis and Associated Risks in Steel Structures. Buildings, 13(4), 905. doi:10.3390/buildings13040905.

Guo, X., Golabchi, A., Han, S., & Kanerva, J. (2016). 3D modeling of workplaces for time and motion study of construction labor. In in Proceedings of the 16th International Conference on Computing in Civil and Building Engineering (ICCCBE), Osaka, Japan, 1516-1523.

Montaser, N. M., Mahdi, I. M., Mahdi, H. A., & Rashid, I. A. (2018). Factors Affecting Construction Labor Productivity for Construction of Pre-Stressed Concrete Bridges. International Journal of Construction Engineering and Management, 7(6), 193–206. doi:10.5923/j.ijcem.20180706.01.

Balar, J. H., Rathod, H. A., & Shah, R. (2018). Effective Time, and Motion Study on Construction Project: A Case Study of Surat City’. International Journal for Scientific Research & Development, 6(3), 31-4.

Prakashbhai, P. S., Ankitkumar, P., & Patel, S. (2020). Time and Motion Study of Construction Activities in Industrial Building. International Research Journal of Engineering and Technology, 7(6), 6583–6593.

Fasching, S., Huber, T., Rath, M., & Kollegger, J. (2021). Semi‐precast segmental bridges: Development of a new construction method using thin-walled prefabricated concrete elements. Structural Concrete, 22(3), 1561-1573. doi:10.1002/suco.202000474.

Rahmawati, R. (2017). Cost and Time of Erection Girder Work with the Launcher Method in the Middle Span of the Surabaya Mastrip Bridge Construction Project. Applied Final Project, Ten November Institute of Technology, Surabaya, Indonesia. Available online: https://repository.its.ac.id/45449/1/3113041045-Undergraduate_thesis.pdf (accessed on June 2023).

Pratama, D. D., & Adi, T. J. W. (2013). Comparative Analysis of the Erection Girder Method Using Launcher Girder and Temporary Bridge in terms of Cost and Time on the Kali Surabaya Mojokerto Bridge. Jurnal Teknik Pomits, 1(1), 1-10.

Marsudi, M., & Shafeek, H. (2014). Cycle time analysis of tipping trailer frame: A case study in a heavy equipment industry. South African Journal of Industrial Engineering, 25(1), 176–188. doi:10.7166/25-1-636.

Antunes, R., Gonzalez, V. A., Walsh, K., Rojas, O., O’Sullivan, M., & Odeh, I. (2018). Benchmarking project-driven production in construction using productivity function: Capacity and cycle time. Journal of Construction Engineering and Management, 144(3), 04017118. doi:10.1061/(ASCE)CO.1943-7862.0001438.

Sánchez-Garrido, A. J., Navarro, I. J., & Yepes, V. (2022). Multi-criteria decision-making applied to the sustainability of building structures based on Modern Methods of Construction. Journal of Cleaner Production, 330, 129724. doi:10.1016/j.jclepro.2022.131335.

Rully, T., & Rahmawati, N. T. (2015). Planning for Work Measurement in Determining Standard Time Using the Time Study Method to Increase Work Productivity in the Oil Pump Division of PT Bukaka Teknik Utama TBK. JIMFE (Scientific Journal of Management Faculty of Economics), 1(1), 12–18. doi:10.34203/jimfe.v1i1.442. (In Indonesian).


Full Text: PDF

DOI: 10.28991/CEJ-2023-09-08-06

Refbacks

  • There are currently no refbacks.




Copyright (c) 2023 Danang Hadiyatmoko, Jati Utomo Dwi Hatmoko, Mochamad Agung Wibowo

Creative Commons License
This work is licensed under a Creative Commons Attribution 4.0 International License.
x
Message