Shi, Xiaobo, et al. “Analysis of the Schedule Risk of Prefabricated Buildings Based on ISM and Research of Transfer Path”. Civil Engineering Journal, vol. 8, no. 1, Jan. 2022, pp. 134-4, doi:10.28991/CEJ-2022-08-01-010.