Shi, X. (2022) “Analysis of the Schedule Risk of Prefabricated Buildings Based on ISM and Research of Transfer Path”, Civil Engineering Journal, 8(1), pp. 134–144. doi: 10.28991/CEJ-2022-08-01-010.