Elsheikh, Asser, Abdullah Saqr, and Ibrahim Motawa. 2025. “BIM-Based Integrated Model for Project Cost Estimation: A Case Study for Concrete Elements”. Civil Engineering Journal 11 (11):4821-47. https://doi.org/10.28991/CEJ-2025-011-11-021.