Shi, X., Liu, C., Liu, W., Shen, F., Chen, J., & Ma, K. (2022). Analysis of the Schedule Risk of Prefabricated Buildings Based on ISM and Research of Transfer Path. Civil Engineering Journal, 8(1), 134–144. https://doi.org/10.28991/CEJ-2022-08-01-010