[1]
Norouzi, A. and Ghayur Namin, H. 2019. A Hybrid Fuzzy TOPSIS – Best Worst Method for Risk Prioritization in Megaprojects. Civil Engineering Journal. 5, 6 (Jun. 2019), 1257–1272. DOI:https://doi.org/10.28991/cej-2019-03091330.