[1]
Almenov, T. et al. 2026. Optimization of Drilling and Blasting Parameters During the Drifting of Underground Mine Workings. Civil Engineering Journal. 12, 2 (Feb. 2026), 654–680. DOI:https://doi.org/10.28991/CEJ-2026-012-02-014.