[1]
Sultan, M. et al. 2025. SEM-Based Decision Support Model for Cost-Quality Impact Analysis on a Fast-Track Project’s Duration. Civil Engineering Journal. 11, 7 (Jul. 2025), 2933–2952. DOI:https://doi.org/10.28991/CEJ-2025-011-07-017.