Diagnostic and Assessment Benefits and Barriers of BIM in Construction Project Management

Faiq Al-Zwainy, Ibraheem A. Mohammed, Kamil A. K. Al-Shaikhli

Abstract


This paper aims to diagnostic and assessment the benefits and barriers of Building Information Modelling in the construction project management. Both open and closed questionnaire was used to explore the views of a number of Iraqi engineers; in order to investigate the level of BIM implementation in Iraq construction sector. Questionnaire indicated an acceptable awareness of (BIM) in Iraq, especially among the young generation of engineers which indicates the arrival of the evolutionary stream of BIM in the next few years. Moreover, questionnaire showed that the most important advantage of implementing BIM in the Iraqi construction sector was the ability to generate accurate 2D plans at any stage, while the least important advantage was the ability to provide a careful planning of the site facilities, with a relative importance of (82 %) and (33 %) respectively. Furthermore, the most important barrier to its implementation was the unspecified responsibilities for data content, as presented by questionnaire, while the least important barrier was the lack of programs efficiency in data exchange and internal collaboration, with a relative importance of (81 %) and (34 %) respectively.


Keywords


Building Information Modelling; Questionnaire; Personal Interview; Barriers; Construction Project Management.

References


Al-shaikhli K. A. "Utilizing Building Information Modelling in Developing Bills of Quantities" M.Sc. thesis, Building and Construction Engineering Department University of Technology-Iraq, 2015.

The National Institute of Building Sciences, "The national building information modelling standard (NBIMS)", 2007.

The American Institute of Architects (AIA), "Building Information Modelling Protocol Exhibit", document E202, 2008.

The Associated General Contractors of America (AGC), "Contractors’ Guide to BIM", 1st edition, 2006.

Kymmell W., ‘‘Building Information Modelling (Planning and Managing Construction Projects with 4D CAD and Simulations)’’, the McGraw-Hill companies Inc., 2008.

Eastman C., Teicholz P., Sacks R., and Liston K., ‘‘BIM Handbook: A guide to building information modelling for owners, managers, designers, engineers, and contractors’’, John Wiley and Sons Inc., 2011.

Al-Zwainy F. m. S. and Al-Marsomi M. S., "Investigation and Evaluation the Performance of the Construction Residential Complexes Projects". International Journal of Applied Engineering Research. Vol. 11, No. 16, pp 8863-8877, 2016.

Al-Zwainy F. m. S., Ibrahim A. Mohammed and S. H. Raheem,. Investigation and Assessment of the Project Management Methodology in Iraqi Construction Sector. International Journal of Applied Engineering Research. Vol. 11, No. 4, 2494-2507:2016.

Al-Zwainy, F.M.S. and F.K. Jaber, Atheer M. Tufiq, "Statistical Evaluation for Communication Management in Iraqi Consultant Bureaus", Research Journal of Applied Sciences, Engineering and Technology Vol. 13, No. 7, pp.593-605, 2016, DOI:10.19026/rjaset.13.3019

Al-Zwainy, F.M.S. and F.K. Jaber,. "Quality control of concrete board piles in overpasses projects in Iraq". Al-Taqani Journal, Vol. 27, No. 4, pp. 29-54, 2014.

Al-Zwainy F. M., "The Use of Artificial Neural Net Work for Estimate Total Cost of Highway Construction Projects" . Ph.D. thesis, Civil Eng. Department, Baghdad University, 2009.

Sarhan F. M. , Huda F. I. , Asmaa A. H., "Modern techniques and methods in engineering education" , Journal of Engineering and Development, Vol. 16, No. 3, pp 1-16, 2012.

Sarhan F. M. , Rana E. K., Shaymaa K. A., "Statistical Evaluation of the Affective Factors on the Process of Preparing Time Schedules for Iraqi Construction Projects", Journal of Engineering and Development, Vol. 17, No. 1, pp 33-61, 2013.

Al-Zwainy F. M. S. and Neran T. H., "Investigation and Evaluation of the Cost Estimation Methods of Iraqi Communication Projects". International Journal of Engineering and Management Research, IJEMR, Vol. 5, No.6, pp.41-48, 2015.

Faiq. M. S. Al-Zwainy, Al-Suhaily R. H., and Saco Z. M, "Project Management and Artificial Neural Networks: Fundamental and Application,” LAP LAMBERT Academic Publishing. 2015.


Full Text: PDF

DOI: 10.28991/cej-2017-00000073

Refbacks

  • There are currently no refbacks.




Copyright (c) 2017 Faiq Al-Zwainy, Ibraheem A. Mohammed, Kamil A. K. Al-Shaikhli

Creative Commons License
This work is licensed under a Creative Commons Attribution 4.0 International License.
x
Message