Reviewing of the Simulation Models in Cost Management of the Construction Projects

Faiq Mohammed Sarhan Al-Zwainy, Reem Amer, Tareq Khaleel

Abstract


Simulation and computational techniques cover a variety of aspects also had proved its feasibility in construction management as whole, so it had adopted by a lot of researches during the last decades with rapid progress. The current study presents a focused review about construction cost simulation using, and provides an overview of such advancements achieved between 1990 and 2016 in construction management sector. This paper focuses specifically on many different topics including construction cost simulation, simulation modelling concept, steps of simulation conducting, simulation purposes, simulation advantages and disadvantages, etc.  Major advances in construction cost simulation area are highlighted, as well as the trends for development and application. Over the selected study period, there has been a substantial increase in the use of high-fidelity simulation in construction cost management.


Keywords


Construction Cost Management; Construction Cost Simulation Modelling; Construction Projects.

References


. Leu, S. S., and Hung, T. H., "An Optimal Construction Resource Leveling Scheduling Simulation Model", Canadian Journal of Civil Engineering, Vol. 29, No. 2, PP 267–275, 2002.

. Hamdy, A. T.,"Operations Research: An Introduction", 8th edition, Pearson Education, Inc Publisher, Newjersey, 2007.

. Chung, C. A., "Simulation Modeling: Handbook: A Practical Approach", 1st edition, CRC press publisher, New York, 2004.

. Shannon, R. E., "Systems Simulation–The Art and Science", 1 st, Prentice-Hall publisher, 1975.

. Snowdon, J. L., Charnes, J. M., Chen C. H. and Yücesan, E., "Introduction To Simulation", Proceedings of The Winter Simulation Conference, School of Industrial Engineering and Management, Oklahoma State University, U.S.A., 2002.

. Xu, J., Nelson, B., and Hong, J., "Industrial Strength COMPASS: A Comprehensive Algorithm and Software for Optimization Via Simulation", ACM Transactions on Modeling and Computer Simulation (TOMACS) journal, Vol. 20, No. 1, pp 1-29, 2010.

. Healy, K. J., Nelson, B. A., Withers, D. H. and Andradottir, E. S., "Introduction to Modeling and Simulation", Proceedings of The Winter Simulation Conference, State University of New York at Binghamton, Department of Systems Science and Industrial Engineering, U.S.A., 1997.

. Alsudairi, A. A., “Simulation as a Tool for Assessing the Economical Aspects of Construction Processes”, the International Conference on Sustainable Design, Engineering and Construction, Procedia Engineering, Vol. 118, p.p 1086-1095, 2015.

. Al-Najjar, Z. J., "Modeling of Construction Operations Using Simulation Approach", M.Sc thesis, Department Of Civil Engineering, University of Baghdad, 2001. (In Arabic).

. Al-Zwainy, F. M., "Modeling of Pavement Maintenance Management System Using Computer Simulation Technique", M.Sc thesis, Department of Civil Engineering, University of Al-Mustansiriyah, 2000. (In Arabic)

. Pannell, D. J., and Doole, G. J., "A Process for The Development and Application of Simulation Models in Applied Economics", The Australian Journal of Agricultural and Resource Economics, Vol. 57, No. 1, pp. 79–103, 2013.

. Yunis, N. M., “Development Workers Efficiency in Construction Project Management By Using Planning Interacting Model”, M.Sc thesis, Building And Construction Engineering Department, University Of Technology, 1990. (In Arabic).

. Aborizk, S., and Wales, R., "Combined Discrete-Event/Continuous Simulation for Project Planning", Journal of Construction Engineering and Management, ASCE, Vol. 123, No. 4, pp. 11-20, 1997.

. Mason, S. J., Fowler, J. W., Jefferson, T., Rose, O., Mönch, L., and Hill, R. R., "Introduction to Monte Carlo Simulation", Proceedings of The Winter Simulation Conference, Oracle Crystal Ball Global Business Unit, U.S.A., 2008.

. Hamdy, A. T., "Simulation Modeling and Simnet", 1st edition, Prentice-Hall puplisher, 1988.

. Boccara, N., "Modeling Complex Systems", 1st edition, Springer-Verlag puplisher, New York, 2004.

. Stevens A., Stephenson, P., Perera, T., Clegg D. R., and Campbell, K., "Simulation in The Construction Industry - A Case-Study Review", 13th Annual ARCOM Conference, King's College, Association of Researchers in Construction Management, 1997.

. Wang, E. Q., "Modeling For Integrated Construction System: IT AEC 2000Beyond”, Facultȇ De L‘Amen‘Nagement Universitȇ De Montrȇal , 1992.

. Shi, J. J., "Computer Simulation in AEC and Its Future Development", University of Hong Kong, Hong Kong, 2002.

. Wakefield, R., and Sears, G., "Petri Nets For Simulation and Modeling of Construction Systems", Journal of Construction Management and Engineering, ASCE, Vol. 123, No. 2, pp 105-112, 1997.

. MicroCYCLONE (2001). Captured on 1/26/2001,from http://ce.ecn.purdue.edu/CEM/Sim/MicroCYCLONE/Index.html Cited by 15.

. Dias, J. M. S., Miguel, J., Capo, A., J., and Gamito, M. N., "A4D: Augmented Reality 4D System for Architecture and Building Construction", Virginia Tech publisher, 2003.

. Sawhney, A., Deshpande, and H., Mund, A., "JAVABEANS-Based Framework for Construction Simulation", Proceedings of The Winter Simulation conference, U.S.A., 2000.

. Al-Aanee, A., J., N., “studying the variation impact on project execution duration by using simulation manner”, M.Sc thesis, Building and Construction Engineering Department, University of Technology, 1994. (In Arabic).

. Tareq, A., K., “Using Simulation Manner in Programming The Linear Projects”, M.Sc thesis, Building and Construction Engineering Department, University of Technology, 2000. (In Arabic).

. Najee, H., A., “Building An Integrative Model between The Risk Management and Value Engineering to Control and Predict The Cost of Construction Projects”, M.Sc thesis, Building and Construction Engineering Department, University of Technology, 2006. (In Arabic).

. Al-keajer, M., "Stochastic Budget Simulation", International Journal of Project Management, Vol. 18, No. 2, pp 139-147, 2000.

. Isaksson, T., "Model for Estimation of Time and Cost Based on Risk Evaluation Applied on Tunnel Projects", Ph.D dissertation, Division of Soil and Rock Mechanics, Royal Institute of Technology, Sweden, 2002.

. Wang, W. C., "Sim-Utility: Model for Project Ceiling Price Determination", Journal of Construction Engineering and Management, Vol. 128, No. 1, pp 76-84, 2002.

. Wang, W. C., "Simulation-Facilitated Model for Assessing Cost Correlations", journal of Computer-Aided Civil and Infrastructure Engineering, Vol. 17, No. 5, pp 368-380, 2002.

. Yang, I. T., "Simulation-Based Estimation for Correlated Cost Elements", International Journal of Project Management, Vol. 23, No. 4, pp 275–282, 2005.

. Amaratunga, R. D. G., Zainudeen, M. N., Shanmugam, M., "Simulation Modeling of Cost Overruns in Building Projects", Research Institute for the Built and Human Environment, University of Salford, Sri Lanka, 2006.

. Wang, W. C., Wang, H. H., and Lai, Y. T., "AHP- And Simulation-Based Budget Determination Procedure For Public Building Construction Projects", journal of Automation in Construction, Vol.17, No. 5, pp 623–632, 2008.

. Pena, R. A. T., "Project Management: A Simulation-Based Optimization Method For Dynamic Time-Cost Tradeoff Decisions", M.Sc. thesis, Department of Industrial and Systems Engineering, Kate Gleason College of Engineering, Rochester institute of Technology, Newyork, 2009.

. Yang, I. T., Chong, W. K., and Chou, J. S., "Probabilistic Simulation For Developing Likelihood Distribution Of Engineering Project Cost", Journal of Automation in Construction, Vol. 18, No. 5, pp 570–577, 2009.

. Kwak, Y., H., Ingall, L., “Exploring Monte Carlo Simulation Applications for Project Management”, IEEE Engineering Management Review Journal, VOL. 37, NO. 2, pp.83-91, 2009.

. Chou, J. S., "Cost Simulation in An Item-Based Project Involving Construction Engineering and Management", International Journal of Project Management, Vol. 29, No. 6, pp 706–717, 2011.

. Malmquist, D., "A Probabilistic Pricing Model For A Company’s Projects", M.Sc. thesis, Department of Mechanical Engineering, Blekinge Institute of Technology, sewden, 2012.

. Mavridis, A., "A Risk Simulation Model to Assess Failure Costs in Geotechnical Construction Projects", M.Sc. thesis, Department of Construction Management and Engineering, University of Twente, Holland, 2012.

. Perez, M., "A Simulation Based Optimization Approach for Stochastic Resource Constrained Project Management with Milestones", M.Sc thesis, Department of Industrial and Systems Engineering, Kate Gleason College of Engineering , Rochester Institute of Technology, 2015.

. Kim, H., Shen, Z., Moon, H., Ju, K., and Choi, W., “Developing a 3D Intelligent Object Model for the Application of Construction Planning/Simulation in a Highway Project”, KSCE Journal of Civil Engineering, Vol. 20, No. 2, pp.538-548, 2015.


Full Text: PDF

DOI: 10.28991/cej-2016-00000063

Refbacks

  • There are currently no refbacks.




Copyright (c) 2016 Faiq Mohammed Sarhan Al-Zwainy, Reem Amer, Tareq Khaleel

Creative Commons License
This work is licensed under a Creative Commons Attribution 4.0 International License.
x
Message